Metering cabinet and measurement units at a public facility in Laayoune
Our services · LV / MV electrical engineering

The electrical installation, calculated and justified

Design, checking and bringing industrial installations into compliance: distribution, protections, discrimination, metering and supervision.

What is at stake

An installation that works is not necessarily compliant

Many industrial installations have run for years with approximate discrimination, undersized cables or an earth electrode that was never measured. None of it shows — until the fault that takes down the whole plant instead of a single feeder.

Discrimination

A fault on one machine should trip only its own protection. Without a study it is the main breaker that trips, and the whole plant stops.

Short circuit

The breaking capacity of the protections must exceed the actual short-circuit current at the point considered. That is calculated, not estimated.

Earthing and lightning

The earth electrode, bonding and surge arresters govern the safety of people and the survival of the electronics.

Control

Metering, supervision and export limitation: knowing what each load consumes comes before any optimisation.

The engagement

From the design calculation report to the switchboard drawing

What we deliver

  • Sizing of the LV and MV circuits, cables and protections
  • Discrimination study and short-circuit current calculation
  • Design of main LV and PV switchboards, cabinet drawings
  • Earthing and bonding reports, lightning protection
  • Metering, SCADA supervision, Modbus TCP and RTU
  • Export limitation and zero-export architectures
  • Power quality: cos φ correction, harmonic filters

Tools and standards

Caneco BTETAPNF C 15-100NF C 13-100IEC 62305-2

Caneco BT or ETAP, depending on the size of the project.

Municipal swimming pool in Laâyoune. EMS cabinet and measurement units — metering, wiring and data feed for the energy management of a public facility.

Related topics

What usually comes with it

An installation to design, or to bring into compliance?

Send us your single-line diagram, even an old one, and your contracted capacity reading. That is enough for a first opinion.

Describe my need